in Portland cement morlar, the back and face of each stone to be pointed in next cement, and all side joint grouted solid. There will be pet to the wall.

160

para

Backing As shown in the typical Cross section

& Purse

Perdue.

it is proposed to back the purre

perdue

due with eight or tene set of clay. Local day is readily obtained from the bed of

the Canton kever,

and

being of remarkable toughness and the earth of

plasticity will sleure

the embankment behind the wall

from being melted and washed out

by the action of the sea through the purre perduce.

Concrete & portand cement concrete ( 6 to 1) Packing to backing will be carried up in avoury wall. at the same time as the masonry

layers